收藏 分销(赏)

APQP各要素关系及职责表(含PPAP).doc

上传人:精**** 文档编号:12596571 上传时间:2025-11-08 格式:DOC 页数:5 大小:47.54KB 下载积分:6 金币
下载 相关 举报
APQP各要素关系及职责表(含PPAP).doc_第1页
第1页 / 共5页
APQP各要素关系及职责表(含PPAP).doc_第2页
第2页 / 共5页


点击查看更多>>
资源描述
1.Plan and Define Program 计划和拟定项目 Customer Sales Dept. QA Dept. APQP Team Engineering 1.6Customer Input 1.2Business Plan/Marketing Strategy 1.1.1Market Research 1.1.2Historical Warranty and Quality Information APQP产品初次会议 1.1.3Team Experience ↓ 1.12Product Assurance Plan ↓ 1.4Product/Process Assumptions ↓ 1.10Preliminary Process Flow Chart 1.11Priliminary Listing of Special Product and Process Characteristics ↓ 1.3Product/Process Benchmark Data 1.5Product Reliability Studies ↓ 1.8Reliability and Quality Goals 1.7Design Goals 1.9Preliminary Bill of Material 1.13Management Support ↓ Output【APQP Schedule List】 2. Product Design and Development 产品设计和开发 Sales Dept. QA Dept. APQP Team Engineering Dept. 1.10Preliminary Process Flow Chart 2.12Gages/Testing Equipment Requirements 2.10New Equipment, Tooling and Facilities Requirements 2.13Team Feasibility Commitment and Management Support 2.1Design Failure Mode and Effects Analysis 2.2Design for Manufacturability and Assembly ↓ 2.3Design Validation ↓ 2.9 Drawing and Specification Changes 2.4Design Review ↓ 2.6Engineering Drawings 2.7Engineering Specification 2.8Material Specification 2.5Prototype Build-Control Plan ↓ 2.11Special Product and Process Characteristics 3.9Measurement System Analysis Plan 3.5Characteristics Matirx 3.1Packaging Std 3. Process Design and Development 过程设计和开发 Sales Dept. QA Dept. APQP Team Engineering Dept. 2.12Gages and Testing Equipment Requirements 2.11Special Product and Process Characteristics 2.8Material Spec. 3.9Measurement System Analysis Plan 3.3Process Flow Chart ↓ 3.8Process Instructions 3.2Product/Process Quality System Review 3.6PFMEA 3.4Floor Plan Layout 3.7Pre-launch Control Plan ↓ 3.12Management Support 3.5Characteristics Matrix 3.1Packaging Std ↓ ↓ 3.10Preliminary Process Capability Study Plan 3.11Packaging Spec. 4.2Measurement System Evaluation 4.1Production Trial Run 4.3Preliminary Process Capability Study 4.6Packaging Evaluation 4. Product and Process Validation产品和过程确认 Customer Production QA Dept. APQP Team Engineering Dept. 3.9Measurement System Analysis Plan   3.7Pre-luanch Control Plan 3.10Preliminary Process Capability Study Plan 3.11Packaging Spec. Approval Grade 4.4Production Part Approval 4.2Measurement Evaluation 4.1Production Trial Run 4.5Production Validation Testing 4.7Production Control Plan 4.8Quality Planning Sign-off and Management Support 4.4aProduction Part Approval List 4.3 Preliminary Process Capability Study 4.6Packaging Evaluation Mass Run 5.1Reduced Variation 5.3Delivery and Service 5.2Customer Satisfaction
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 管理财经 > 人员管理/培训管理

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服